Highways Agency Headquarters Stage 2
completed |
|
|
April
2006 has seen the completion of stage two of a four stage
project for the Highways Agency. Paramount
has completed the installation of an Integrated Intruder and Access Control
System, protecting all four floors and perimeter car parks. Paramount
was nominated as a specialist contractor to provide
a fully integrated security solution, comprising of Intruder and flood
alarms, access control, CCTV and Traffic barriers. |
|
|
|
|
|
The entire
solution is fully integrated; and in the event of an activation of any type
of alarm or unauthorised entry attempt at a door or barrier, the CCTV in the guard room zooms to the location of the event, providing
the security staff with a live view of any type of occurrence. A local
security PC also displays maps of the site, graphically demonstrating the
precise location of a potential problem. |
|
|
|
Two Way audio help points were installed around the site
location, also integrated with the CCTV and connected to the Guard Room. The
contract is due to be completed in August 2006. |
Installations Index Or Home Page